Yes you could remove the text line that uses "&proi_rev" , but the intention is not to do that. You want to remove the human error that could exist when you have a drawing and PDM system that don't match on revisions. If I was the admin at your location and someone needed to change the revision on the drawing I would have them discuss this with me before making any changes. Eric Mills
Design and Project manager
http://www.rapidoconsulting.com
eric.mills@rapidoconsulting.com