cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Did you get an answer that solved your problem? Please mark it as an Accepted Solution so others with the same problem can find the answer easily. X

Translate the entire conversation x

Traceability with external SCM not visible in codebeamer 3.0

MM_10919030
10-Marble

Traceability with external SCM not visible in codebeamer 3.0

External SCM commit items attached to a task item is not visible under the traceability tab of a work item, even after checking the show external SCM checkbox.
I have linked CB with Github using external SCM repository option.
I was able to get these items before updating to version 3.0, is there anything i am missing?

ACCEPTED SOLUTION

Accepted Solutions

The problem was fixed after upgrading codebeamer to 3.1, thank you

View solution in original post

5 REPLIES 5

Hello @MM_10919030 ,

 

This should still work in 3.0. Are you setting up the repository following this guide: External SCM - Azure Repository?

 

Thank you

Hello @cristina.b ,
Yes, this guide was followed for external integration with GitHub.
I can see my commit messages visible in SCM tab of the work item. But when viewed from the traceability browser, I cannot see any associated SCM commit items.

The problem was fixed after upgrading codebeamer to 3.1, thank you

Hi, was it 3.1.0.0 or 3.1.0.1?

3.1.0.1

Announcements


Top Tags