Similar to track changes in Microsoft word. I realize there is a difference report. There is also a compare to picture. These are close, but not what I want.
I want a report that highlights lines and words that have changed between 2 models or drawings. In the case of drawings I want it to compensate for the fact that views might have shifted a little bit. IE if I add a hole to something and move the view it shouldn't highlight the whole view, just the lines that represent the new hole feature. It should output 2 drawings with highlighted lines and words. The original and the new. The original would highlight lines and words that are no longer in the new and the new would highlight lines and words that are new.
This report should be able to be saved as a PDF. Even better it would be great to be able to have a PDMLink publisher run this report at each check in or on demand to compare 2 different versions or iterations of a drawing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.