The following situation is given:
top-assy
|
--- part2
|
-- assy1
|
--- part1
part1 and assy1 one have a position number in the bom list.
If user wants to create a bom flag by picking a geometry of part1 a confirmation dialog should be
displayed by the system and user has to confirm to create a bom flag for part1 or assy1.
Today always the bom flag for part1 will be created.
Workaround in 18.1 M050: switch dialog option to create a bom flag by table entry and not by geometry.
A confirmation dialog explained above would be better !
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.