cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Variation Point remains Undecided while Variant is Undecided in a Decision Set (ART18-14895366)

Variation Point remains Undecided while Variant is Undecided in a Decision Set (ART18-14895366)

Actually, when a Variant of a Variation Point is set to Include in a decision set, then  Variation Point is automatically set to Included, and Undecided Variant of this Variation Point will be excluded at creation of a production model

For example, in the following case:

image 1.png

 

Then the created production model will contain the following:

image 2.png

 

The proposal is to remain the Variation Point to Undecided status while Variant are still at Undecided:

image 3.png

 

Then, when creating the production model, only the Excluded Variant are removed (with all associated items), Items associated to Included Variant are moved in the production model , and all undecided Variants and Variant Points (with associated items) are also moved in the production model

By the end, the content of the production model should be:

image 4.png

 

 

1 Comment
Aquamarine
Status changed to: Under Consideration

hi,

 

Thanks for the idea, we agree this would be a good enhancement. I've captured the requirement with the ID ART18-14895366 and we are considering for inclusion in Integrity Modeler 9.1

 

regards,

Patrick