How are you milling in 5 axes? Positioning only, full simultaneous 5 axes?
Or both?
Do you have one post to handle both of these types of programs? For
instance the positioning type with the G7 function, and then another for
true simultaneous 5 axis surface type machining?
Do you toggle the G7 function on and off with CL commands or is this
picked up by your post?
How are you defining tool axis in Pro E?
5 axis sequence with axis def?
Or 3 axis with sequence csys?
Thanks. All replies appreciated.
Eric Vidra
Manufacturing Engineer
Toyota Racing Development
335 East Baker Street
Costa Mesa, CA 92626
eric_vidra@toyota.com
(714) 708-4215 - p
(714) 444-2217 - f
This thread is inactive and closed by the PTC Community Management Team. If you would like to provide a reply and re-open this thread, please notify the moderator and reference the thread. You may also use "Start a topic" button to ask a new question. Please be sure to include what version of the PTC product you are using so another community member knowledgeable about your version may be able to assist.