local milling take 7 hours for cutter path calculation
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
local milling take 7 hours for cutter path calculation
In creo 9.0.4.0, 540*160*5mm size, use mill window + volume rough with Diameter 8mm tool, and then followed by local milling with Diameter 4mm tool to remove residual material ( with pre-sequence in local milling ) , it takes 7 hours to complete path calculation, it is hard to continue my job. any comments for this issue? are any parameters wrong used in local milling?
Solved! Go to Solution.
Accepted Solutions
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
For a part like this, with many identical pockets, the usual technique is to do an individual pocket tool path, and then array it.
Roughing tool paths can use a loose tolerance if necessary.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
For a part like this, with many identical pockets, the usual technique is to do an individual pocket tool path, and then array it.
Roughing tool paths can use a loose tolerance if necessary.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
Thanks Bmuller,
I will take your advice, as for loos tolerances, it will affects Roughness of surface area.
