Community Tip - Did you get called away in the middle of writing a post? Don't worry you can find your unfinished post later in the Drafts section of your profile page. X
Hi everyone!
I am coding with Mathcad a worksheet that is supposed to generate the response spectra for earthquake data. I have achieved it using the Implicit Method, but when I use the Explicit Method (Central Difference Method) I get the message that there is a floating point error. Could somene please help me to fix this problem?
Thank you
You have included no data for ug!!
Alan
Hi Alan!
Sorry for that, mine opens with ug inserted. Please find attached the data I used as ug.
The local variable u gets bigger with every step, and at step 97 you get a floating point overflow when calculating phat. I'll also note that udot and udotdot are not used for anything, and could be deleted.
OK, Richard has beaten me 😉
If i is 96 the multiplication a*u_i exceeds Mathcads limit of 10^307 and throws the error.
You'll have to check the algorithm used.
For whatever it may be worth find attached the file with embedded data.
@WernerExinger wrote:
OK, Richard has beaten me 😉
You were snoozing!
Or snoring ?
@RichardJ wrote:
@WernerExinger wrote:
OK, Richard has beaten me 😉
You were snoozing!
Yeah! Looks like I am getting lazy and slow
Thank you all for your quick response! 🙂 I´ll check the algorithm used