Hi All,
I am looking to see if there is a way the Change Task number can be added to a revision block on a Creo drawing. Possibly by grabbing a attribute from windchill?
Thanks.
I don't think it's possible. If it is possible then how would the drawing know what Task in your system to add to the drawing since there are more than 1?