cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Help us improve the PTC Community by taking this short Community Survey! X

Version (Revision + Iteration) on drawing?

JoshuaHouser
16-Pearl

Version (Revision + Iteration) on drawing?

Hi all,

I've done a fair amount of searching to identify opinions & processes, but really haven't found much on showing iterations on drawings. I saw one point (Mike L) for including the full version on a drawing and one (David M) removing all Windchill data from the drawing.

I am interested to hear if anybody has arguments against putting Revision & Iteration on a drawing vs. only the Revision ( Rev. A vs. Rev A.4).

Another issue would also be putting the Lifecycle State on the drawing.

 

I know a case for only a Revision on a drawing is that I can make iteration changes without a new drawing. If a lifecycle state changes due to workflow and I don't have the iteration or Lifecycle state on that drawing, I do not have to print/publish a new drawing.

 

If I have a Lifecycle, Iteration or other Windchill attribute on a drawing, I can republish for an update without requiring a CAD Author to make the change. (This can also be managed automagically in a workflow).

 

Looking forward to some discussion.

Josh

 

 

 

5 REPLIES 5
TomU
23-Emerald IV
(To:JoshuaHouser)

I include the revision and the iteration of both the model and the drawing in our title block.  It's small enough that most people don't even notice them, but it is exceedingly handy as an administrator when trying to figure out where a particular drawing came from.

 

TomU_0-1619462280934.png

 

Having this information also makes it very easy to know exactly which iteration of a model was is use when the drawing was created.  This can be helpful when someone updates a model but fails to update the drawing.  Since all our drawings are published 'as stored', the model checked in with the drawing is the one that will be shown on the drawing during publishing, not whatever might be the latest.

 

On the other hand, I don't include the lifecycle state directly on the Creo drawing.  I don't want the contents of the drawing changing between what is checked in (and visible in the Creo file open preview) and what is published in Windchill, and this would happen if state were included.  Instead I add approval information to the PDF (Fishbowl add-on) and include state as a watermark in Creo View (since approval information can't as easily be shown and positioned in Creo View.)

 

TomU_2-1619463497484.png

 

TomU_1-1619463377342.png

 

We only publish the Revision information on the drawings for the drawing. Our process releases both the drawing and model at the same revision, so no need to track iterations. If a change is needed, the model and drawing must be revised to the next revision. I do have symbol that shows the revision and iteration with the date that is shown on drawings issued for checking and review purposes before the final signoff review. From what I have seen, most of the designers remove that little table and it is not used as management intended. 

StephenW
23-Emerald III
(To:JoshuaHouser)

We use a symbol just outside of the border to pull version and iteration and filename of the model and checkin date of the drawing. These are specifically used to verify the model and the drawing were "checked in" and matches what's in PDMLink prior to release. This helped solve "i forgot to check in" issue.

StephenWilliams_0-1619518678254.png

 

@StephenW , that's interesting, I haven't seen the "Checked-In" date.

We use the following in our formats:

PTC_WM_REVISION

PTC_WM_MODIFIED_ON

PTC_WM_LIFECYCLE_STATE

 

In our config.sup we have

date_type_parameter_format %mm-%dd-%yyyy

We use the Modified on and Lifecycle state in the revision block to show the drawing release status and what date it was last touched.

Announcements
NEW Creo+ Topics: PTC Control Center and Creo+ Portal


Top Tags