Kits are typically managed as phantom mfg assemblies which should not be consumed by an operation.
However it makes sense to validate that the correct kit is used like scanning a bar code.
Therefore it should be configurable by a preference if a mfg phantom can be allocated. The allocation type should be validation and NOT consumed.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.