Enable the positionning of several occurences of a same tooling in operations of Process plan

Enable the positionning of several occurences of a same tooling in operations of Process plan

In Windchill MPMLink it is possible to increase the quantity of an allocated tooling to the operation. Whatever the quantity of the tooling is, it will be visible only once in the visualization of the operation. As a consequence, it can be positionned only in one place but the other occurences can't be positionned.

It would be great if we could positionned every occurences of a tooling in the operation visualization (example of fixtures which are the same but positionned in different places)...