Make it possible to escalate multiple incidents from within a FRACAS graph in Windchill Quality Solutions. This could be done by adding some functionalities to the drill-down table that is displayed when clicking an area in a graph corresponding to a group of incidents.
In the drill-down table:
1.Add the possibility to select multiple incidents.
2. Add the possibility to escalate/associate selected incidents to/with problems.
3. If number 2. is not possible, make sure that the button "go to selected incident" is enhanced to include all selected incidents in 1. and not just one at a time.