MPMLink: support the case when several eBOM (WTPart Design) are equivalent to a single mBOM(WTPart Manufacturing)

MPMLink: support the case when several eBOM (WTPart Design) are equivalent to a single mBOM(WTPart Manufacturing)

As related in the case 10510458

 

https://www.ptc.com/appserver/cs/view/case.jsp?n=10510458

 

In some case, different Design WTParts are equivalent to a single common Manufacturing Part (case where we use the same raw material to manufacture quite "similar" finished part)

 

But if this different design WTparts are used in the same product (ie in the same eBOM, let's says 3 different parts quantity 1), in the mBOM, we will have the common equivalent manufacturing part in quantity 3.

the eBOM and equivalent mBOM are OK, but the consolidated equivalence report in MPMLink displays it as a difference. It should not....

1 Comment
PTCModerator
Emeritus
Status changed to: Archived