Provide a “Time out” or warning when calculating a system that has an availability tending towards “1”.
Rational: We experienced what looks like a software crash/hang when calculation systems with high redundancy/availability. As the Availability tends towards “1” the calculation progress stops at 65% (this could be for an undetermined time period as the simulation is looking for that instance of failure).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.