Rolling baseline based on lifecycle state. Need a config spec that can be applied on a product based on date/time of released. Ex. As released. Similar to As Stored on CAD.
It should also be possible to define As Released baseline where the state could have multiple values e.g.
Part can be Engineering Released and Manufacturing Released in design view. Latest Released could mean the latest design view version that is either in state Engineering Released or Manufacturing Released.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.