The PDMLink action “Replace” available in a Part Structure should behave like the MPMLink “Replace” action available in the MASPB: i.e.: in case the Part replaced in the BOM was consumed in an Operation, it must also be automatically replaced in that Operation (automatic check-out of that operation).
Same for the replacement done through the PDMLink action “Perform Mass Change” (from a Change Task). It should manage consuming Operations; currently no Mass Replacement is possible in mBOM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.