Update FRACAS Problem from Engineering Change

0 Kudos

Update FRACAS Problem from Engineering Change

Currently in WQS 10.1, there is automatic integration allowing a FRACAS Problem to be escalated to an Engineering Change in Windchill. This allows the user to then go through their business's Engineering Change process/workflow in Windchill.

An improvement would be to allow the status of the Engineering Change to be seen in WQS with the FRACAS Problem, so that the Problem can be finalized and closed out after the Engineering Change is completed.

1 Comment
Community Manager
Status changed to: Archived