When a drawing is viewed in CreoView, there are 4 entries created in the Audit Logs tables. There should only be one table entry for that event, not 4. This would result in a much smaller footprint for that activity in the Audit Log tables. This could also be handled via a preference / property to control the creation of all 4 versus just 1 entry.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.