In IBM Rational Doors, it is possible to get word change bars in the exported document to show the changes between 2 Doors Baselines. It could be wonderfull to have the same with Integrity.
The word exported document should have change bars to show the requirement changes between 2 Integrity document versions. This is very usefull and mandatory to allow our customer to review our specification and design documents.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.