Creating New Variant option for all levels in the BOM
Aug 28, 2019
04:59 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
Aug 28, 2019
04:59 AM
Creating New Variant option for all levels in the BOM
Working with O&V, when a new variant is generated from overloaded structure, if a variant exist in the system with the same options, the existing part is getting selected by default at children level.
We require an option to select whether it should create a new part or reuse the existing part at different levels.
If this option exists already, kindly update us.
Labels:
- Labels:
-
BOM_Platform Mgmt
-
Other
0 REPLIES 0
