Hello all,
I have a part where changes were made changing the part from A.3 to A.4 and those changes are no longer needed at the time. I'm wondering if there is a way to check out A.3 then check in changing the part from A.3 to A.5. I would like to still keep A.4 incase we decide to revert back to that model.
Thanks!
Solved! Go to Solution.
Yes there was a preference setting under "Create and Edit" that changed with the upgrade. Changing it to allow the non latest iteration to be checked out makes the Leap Frog process work.
Thanks for your help with this!
Open the A.3 iteration in a clean workspace, then do a check-in. It will go into Windchill as A.5.
For safety, be sure that the part is not in other workspaces.
Before upgrading to 11.1 that option worked but since we upgraded I now receive a message saying that it cannot be checked out because its not the latest iteration.
Thanks!
Yikes! I am still on 11.0.
Open the A.3 in Creo and do a backup to disk.
Erase all from memory and the workspace.
Open the A.3 from disk and see if it comes in as a new part.
You should then be able to check it in as A.5.
Is there a preference setting that changed with 11.1 that prevents non-latest iterations from being checked out?
Yes there was a preference setting under "Create and Edit" that changed with the upgrade. Changing it to allow the non latest iteration to be checked out makes the Leap Frog process work.
Thanks for your help with this!
FYI, we don't allow check out of non-latest iterations, but that doesn't stop someone from bringing an older version forward as the latest.