cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - You can subscribe to a forum, label or individual post and receive email notifications when someone posts a new topic or reply. Learn more! X

Translate the entire conversation x

Need to create a baseline... without the baseline option

c.strohhacker
1-Visitor

Need to create a baseline... without the baseline option

Hi,


This problem is somewhat unfortunate as it wouldn't exist for us in a couple of months. We will be migrating to Windchill in the next few months... Our current system is Intralink 3.4, our licenses are single site so no ability to create baselines.


We have a major project, the initial prototype has been rejected consequently the redesign is substantial. Unfortunately, there is a strong possibility that the initial prototype will actually go into production.


So if we want the ability to delineate the two designs without baselinesis there any ‘nice’ way to do this other than creating a copy of the existing design and completely separating the two designs?


Thanks.


0 REPLIES 0
Announcements

Top Tags