Community Tip - Did you get called away in the middle of writing a post? Don't worry you can find your unfinished post later in the Drafts section of your profile page. X
Is it possible to change status of the drawing from 40 to 10 in PDM without changing revision?
Are those lifecycle levels for your company?
We use draft, design, prototype, released and obsolete.
The drawing status can be changed if you have the proper permissions. See your PDM administrator for help.