Community Tip - Want the oppurtunity to discuss enhancements to PTC products? Join a working group! X
I've been in 1,001 discussions about whether or not to leave for example Rev C at Released when changing from Rev C to Rev D, or move Rev C to "Superseded" or some variation. Always lots of emotion. Most don't make the change.
We don't do this but are now considering again.
Please comment if you leave old Reviisions at Released or change their state when a new Rev comes along.
Patrick,
How do you set the Affected data to Released-History?
I assume you use "change" in the lifecycle to set the Resulting Items to Released on the higher version?
Mike,
When we create a new version/revision we automatically set the previous version to another state. We are always build to latest rev, and our business rules state that if B is not interchangeable with A, then it should be a new part number, which in turn means a revision of any assembly using the component. Clearly there are special cases where this does not need to apply, like in the case where something has only just been designed and there is no inventory anywhere.
Procedurally we state that Customers of Engineering data must access content from Windchill, and they cannot access documentation that is not released. So the state change on old versions is done to ensure that things only get built to the latest version and that new inventory doesn’t get built while undergoing revision. So while something is “out” for revision they have to ask Engineering for documentation they don’t currently have permission to.
If it was possible to build access control rules explicitly around “Latest version” (and also “Latest Iteration” for that matter) the state change would not be necessary for us. That is functionality we would really like.
-----
Lewis
In Reply to Mike Lockwood:
I've been in 1,001 discussions about whether or not to leave for example Rev C at Released when changing from Rev C to Rev D, or move Rev C to "Superseded" or some variation. Always lots of emotion. Most don't make the change.
We don't do this but are now considering again.
Please comment if you leave old Reviisions at Released or change their state when a new Rev comes along.
We only have one released object at any given time. Only one thing can be released. If something is newer that is released, the older thing that was released is now "superseded". It means a couple of things here. First, it's still manufacturable meaning that if there's WIP on the floor, you can still continue making it to the earlier rev. The second thing is that does is what I've already stated: If you see something superseded, there's a newer one that's released. In Med Device terms, that's preventing unintended use.
We use Division Productview with Pro/INTRALINK and we had a lot of problems with people accidentally pulling out earlier revs that were still showing released when they meant to pull the latest. By definition, only one can be released.
In Reply to Mike Lockwood:
I've been in 1,001 discussions about whether or not to leave for example Rev C at Released when changing from Rev C to Rev D, or move Rev C to "Superseded" or some variation. Always lots of emotion. Most don't make the change.
We don't do this but are now considering again.
Please comment if you leave old Reviisions at Released or change their state when a new Rev comes along.