Is it possible to specify the EPM sub-type in WC 10.1 using an OIR? With a multi org WC installation there will be a different EPM doc types for each org. So if a user from org A creates a Pro/E model it is assigned the EPM sub type for org A. PTC documentation states to use the paramemter UPLOAD_SOFT_TYPE to specify the sub type. This will be difficult because a few orgs import a lot of new CAD data from design partners.
--Kirk Wemple
Hello Patrick,
have you got any custom OIR Java algorithm from PTC please? I would like to have a different soft type on one product. Thank you
David