Parenthesization problem. In the definition of s2 the ln factor is not within the summand but is multiplying the entire sum. Doesn't work, because of the invalid (in that context) use of the range variable i. Fix the parentheses and you get a solution.
There is also something seriously wrong with your file. It is much bigger than can be accounted for by its contents. Copying the entire contents to a new file results in a much smaller file. If you are not actually using MC11 but just saving in that format from a newer Mathcad version, the problem may be in the down-conversion.
__________________
� � � � Tom Gutman