Question
What is the significance of field mapping in integration of windchill and integrity(PLM-ALM) and i what ways we can use them in PTC navigate manage trace?
I am integrating Windchill 11.0 M010 with MKS integrity 10.9. I got stuck in field mapping hence unable to locate Windchill parts in Integrity and corresponding Integrity Documents in Windchill.
What can be the solution for this?

