We are in the process of connecting PDMLink 9.1 (M040) - Oracle 11.5.9 using ESI for Oracle.
We are getting ready for our first pilot and are trying to figure out how to synch Windchill and Oracle together.For data that only exists in Windchill we’ve been successful pushing the data through ESI to Oracle.
For data that is both in Windchill and Oracle, we have not been successful. What I was doing was the following
1. Ensure that the data was in sync, descriptions, revisions, states etc.. between the systems.
2. Load into Windchill Distribution Targets to match the Inventory Orgs in Oracle. This then allowed me to see the Distribution Targets in the Windchill UI for that part.
Am I missing any steps in preparing Windchill for data that already exists in Oracle. (note I’m excluding BOM Headers in this case, that will add another level of complexity, but I figured I should crawl first…)
i've attached the two load files for reference.