We are working to address an issue with subscription email notifications. In the meantime, be sure to check your favorite boards for new topics.
Hi,
Could you please share your experience?
Revision Scenarios | |
1 | Terminal Change (Qty 4) |
2 | Length Change |
3 | Connector Change (2 x 4Pins) |
4 | Connection Change (6 Wires) |
5 | Tape removal (Qty 2) |
6 | Tape addition (Qty 2) |
7 | Notes Change |
8 | Wire Color Change (Qty 😎 |
9 | Wire Guage/Style Change (Qty 😎 |
10 | Splice Change (Qty 1) |
11 | Diode/Fuse Add |
12 | Grommet/Clip Change (Qty 1) |
13 | Grommet/Clip Reorientation (Qty 1) |
14 | Wire Branch deletion |
15 | Wire Branch modification (one branch out location to other branch out location |
16 | Connector cross section view change |
17 | Ferrite coil length change (changing from x number of turns to y number of turns) |
For above scenarios how much your organization takes to revise any design for above mentioned scenarios?
Product | Steps | High | Medium | Low |
Creo Schemetics | Wiring Diagram | |||
Report table | ||||
XML | ||||
Procable | Simplified rep of Master Assy. w.r.t. wiring assembly | |||
Harness Component Placement in Model | ||||
Creation of Skeleton model & shrink wrap (extracting surfaces of simplified rep) | ||||
Co-ordinate System creation | ||||
Assembling harness parts (Skeleton model) | ||||
Importing XML | ||||
Network path creation | ||||
Autorouting of wires | ||||
Family instance creation | ||||
Flattening of Harness | ||||
Drawing creation with BOM Table, Cut sheet, Spool table, Connector view | ||||
Check-in / Check out in Windchill | ||||
Promotion request process in Windchill |