cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Learn all about PTC Community Badges. Engage with PTC and see how many you can earn! X

BOM Transformer Synchronization issue between Design and Engineering view

AK_10813265
7-Bedrock

BOM Transformer Synchronization issue between Design and Engineering view

I am using Windchill PDMLink Release 12.0 and Datecode with CPS 12.0.0.0

When a Change notice is created with the Workflow, The change task includes both Design view and Engineering view of a WTPart, along with associated CAD and Drawing as Affected/Resulting objects, The Design View and Engineering View have Equivalent Links when routed to the Change Activity task, Upon reaching the Change Activity task, the Data Assurance Team checks out the associated drawing and updates the title block and revision block with users names and dates, When checking out the drawing, it causes the Design View to iterate and creates an equivalency mismatch between the Design View and Engineering View. Users then have to resolve the discrepancies in BOM Transformer to synchronize the Design view with the Engineering view.
So can we do any customization on linking/Synchronization the Design and Engineering view in the BOM Transformer
ACCEPTED SOLUTION

Accepted Solutions
Fadel
22-Sapphire I
(To:AK_10813265)

As far as I know , There is no API to update EQL (remove out of date ) , we have only APIs to cerate and navigate EQL ,see https://www.ptc.com/en/support/article/CS47538 

Fede

View solution in original post

4 REPLIES 4
Fadel
22-Sapphire I
(To:AK_10813265)

As far as I know , There is no API to update EQL (remove out of date ) , we have only APIs to cerate and navigate EQL ,see https://www.ptc.com/en/support/article/CS47538 

Fede

Hello Fadel,

 

Is there any preference which can be made to synchronize upstream part with the downstream part, or any preference can be created which can let user know that it is out of date?

Fadel
22-Sapphire I
(To:AK_10813265)

No there is no API for the EQL status , https://www.ptc.com/en/support/article/CS378099 , the status is calculated on the fly bin  MAPSB/BOM Transformer , it depends on EQL network and filters applied on EBOM /MBOM 

Fede

Hello Fadel, 

 

thanks for the input, there is no preference management which can be created to help this synchronize issue?

Announcements

Top Tags