Check in of dependent objects
Oct 31, 2019
11:38 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
Oct 31, 2019
11:38 AM
Check in of dependent objects
Hi
Background :
I have an assembly A.asm which has three child parts p1.prt , p2.prt and p3.prt..
These four objects are available on windchill.
I got these four objects from other users through email. He had modified and don't have windchill. So, I saved it on local drive on computer.
I opened assembly in Creo from disk (so all four updated objects in Creo), checked out assembly from windchill. Performed default check in of assembly from Creo.
With this operation, I got assembly and parts iterated to next version on windchill.
Problem Description:
This is what it is (all four objects iterated to next version) on windchill configuration one.We have another setup of windchill. Above same scenario with same data is tried out. There I got only assembly updated to next iteration, not dependent parts.
Query :
What is there in windchill setup 1 which updates all four objects to next iteration by simply doing check in of assembly? In other words, what could be done on setup 2 or setup one to make both identical?
Background :
I have an assembly A.asm which has three child parts p1.prt , p2.prt and p3.prt..
These four objects are available on windchill.
I got these four objects from other users through email. He had modified and don't have windchill. So, I saved it on local drive on computer.
I opened assembly in Creo from disk (so all four updated objects in Creo), checked out assembly from windchill. Performed default check in of assembly from Creo.
With this operation, I got assembly and parts iterated to next version on windchill.
Problem Description:
This is what it is (all four objects iterated to next version) on windchill configuration one.We have another setup of windchill. Above same scenario with same data is tried out. There I got only assembly updated to next iteration, not dependent parts.
Query :
What is there in windchill setup 1 which updates all four objects to next iteration by simply doing check in of assembly? In other words, what could be done on setup 2 or setup one to make both identical?
Labels:
- Labels:
-
CAD Data Mgmt
- Tags:
- default
- iterations
2 REPLIES 2
Oct 31, 2019
12:19 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
Oct 31, 2019
12:19 PM
Did the components of the assembly get checked-out on both systems?
Were the components modified on both systems? Windchill will not check in an object that it does not think has been modified.
Nov 01, 2019
02:47 PM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Notify Moderator
Nov 01, 2019
02:47 PM
Yes... Components of assembly are modified on both systems.
Not sure about checked out status as I have not varified on workspace.
If it's get iterated, then it is sure that it was getting checked out.
Not sure about checked out status as I have not varified on workspace.
If it's get iterated, then it is sure that it was getting checked out.
