cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - If community subscription notifications are filling up your inbox you can set up a daily digest and get all your notifications in a single email. X

Date Parameters in WC for use with Pro/E

SAP010101
10-Marble

Date Parameters in WC for use with Pro/E

Anyone know how to create a date parameter which can be used to propogate sign off dates in Pro/e files driven by release procedure in Windchill? I can create a Date CADAttribute with Manage Global Attributes but problem is Pro/E has NO date parameters and only strings, therefore the valid formatting is problematic when entering in Pro/E as WC will not accept unless exactly the way it is specified in the setup. It would be nice if you could setup a drop down calendar to appear when selecting the date and drive this way. Just curious to know how others are integrating WC with Pro/E to control dates for use in drawing formats.

Thanks.

0 REPLIES 0
Announcements


Top Tags