cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Learn all about the Community Ranking System, a fun gamification element of the PTC Community. X

EPMASSTORED For EPMReferenceLink

Anish_K
10-Marble

EPMASSTORED For EPMReferenceLink

EPMReferenceLink is Object to Master (i.e. Drawing to PRT/ASM) . whenever drawing is getting linked to PRT, windchill will not store revision for PRT in DB.

For Business Use case I want to get the version and iteration for PRT from EPMASStored to derive lifecycle state for PRT from DRW revision.

 

 

2 REPLIES 2
avillanueva
22-Sapphire II
(To:Anish_K)

Are you looking to do this via Java code, SQL or a Report Builder qml? It should be possible since the EPMASStored is a baseline. It not only fixes versions, it is to the iteration level. This might present a problem to you if you are looking to get the version of the related PRT object. That object may have been iterated or even revised since that baseline was created. 

 

 

Actually I am trying to Revision, Iteration of PRT only because we want to know at which specific rev, iteration of PRT the drawing was linked

Announcements


Top Tags