Community Tip - Need to share some code when posting a question or reply? Make sure to use the "Insert code sample" menu option. Learn more! X
We are investigating ways to steameline our change process. One thing that we were looking at using was the use of ProjectLink to take a released object or more make some what if scenarios during the investigation and then move them back over to PDMLink if we like the changes. The desire would be to bring the results back at the next Version not the next iteration. Is this possible?
Thanks,
Steve D.
