cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Visit the PTCooler (the community lounge) to get to know your fellow community members and check out some of Dale's Friday Humor posts! X

Replaced Drawing

vtadeusantossiq
1-Visitor

Replaced Drawing

I want to indicate that the drawing number 00001 was replaced by drawing number 00002.

When someone search the drawing number 00001 something like a watermark indicate the current or correct drawing is the number 00002.

I'm talking about EPM document, not WTPart

1 REPLY 1

Hi there,

One option would be adding a Supercedes and/or Superceded By Global attribute to the EPM document type. That way users can edit those fields to show which files replaced what.

Hope that helps,

Daryl

Announcements


Top Tags