cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Help us improve the PTC Community by taking this short Community Survey! X

TK Linking to WS with Windchill

msteffke
14-Alexandrite

TK Linking to WS with Windchill

I have an existing TK app that links to a workspace (IL3.4) For the
link to work the pdm_ldb_path env variable needs set. We are migrating
to Windchill. When you create a worksspace is the PDM_LDB_Path still
relevent? Is that workspace truly local?


Mark Steffke
Engineering System Administrator
The Delfield Company
Manitowoc Foodservice
T 989.775.9215 or 989.773.7981, ext 12484
Integrity, Commitment to Stakeholders, and Passion for Excellence

2 REPLIES 2

Mark,
Workspaces in ProI behave differently in Windchill. Read the Pro/TOOLKIT API Wizard under User's Guide->Data Management: Windchill and Pro/INTRALINK Operations. This will guide you through the steps to connect to WC and register a workspace. The workspace is both local and server side. To work with an object in ProE it must be downloaded to the local workspace. As far as the PDM_LDB_PATH variable the new one for WC is PTC_WF_ROOT.

Patrick Williams | Engineering Systems | o: 616.698.3766
[cid:image001.jpg@01CC1B91.5275EE10]

As far as I know you can't create a workspace with the API while Pro/E is in full visible mode. You can only create it if Pro/E started with the Batchmode Option. The only way to create one programaticly while Pro/E is full visible is a mapkey.


Has someone other excperiences with this thematics ?


Best regards,


Eike

Announcements


Top Tags