The PTC Community will be on read only status starting March 23rd in preparation for moving our platform to a new provider. Read more here
In a Dynamic Time Analysis I have applied 5 different load sets i.e. Fx, Fy, Fz, Tx, Ty.
And I have drawn graph results Stress(Measure7) Vs Time. Pls refer the attachment.
But in the graph it is written as on Fx load set only & not the all load set . so my query is , Is it the stresses shown in the graph is because of Fx load set only or it is a cumulative stresses because of all load set ??
(For your information, before running I have created user defined measure of stress(Measure 7) over the time domain in each time step.) 
