Hi,
With Options & Variants capability in windchill 9.1, how we can build the rules (Parameters, expressions, constraints, case tables, etc.,) to drive the quantity of an item under an Advanced Configurable Part?
Example:
Consider below BOM:
Top_Part (Adv Config Part)
Part1 (for option1) Qty - 1
Part2 (for option2) Qty - 2
Part3 (for both options) Qty - 2 Meters for Option1 and 5 Meters for Option2
While configuring, selecting option1 should result in:
Top_Part
Part1 Qty - 1
Part3 Qty - 2 Meters
Selecting option2 should result in:
Top_Part
Part2 Qty - 2
Part3 Qty - 5 Meters
Can you please help in this?
Thanks,
Prabhakaran V.
It's possible by speciying qty parameter in BOM structure on Uses:
Do you know if this is possible in 10.2 M030, if yes can you provide steps to reproduce the parameter in Quantity?
I haven't tried on 10.2 (11.0 is what I tried) but if you can load the sample Options and Variant loader it shall be self explained, just make sure to set PSE preference and open the config module in PSE
I do not have access to the sample, could you post some screen shots of the expression and how to setup. I have looked at help and am still confused, would save me a ton of time and be greatly appreciated.
Greg
Greg,
Did you get an answer on loading the sample Options & Variants.
I am on 10.2 M030. Do I have any luck on getting the sample into the system??
Thanks,
Ravin kayasth
I did not receive an answer.