Community Tip - Did you know you can set a signature that will be added to all your posts? Set it here! X
Windchill 9.1 m060, is it possible to create a new document in the Library at some other revision level than the default. We use alpha revisions for prototype and numeric for production. This workswell for the CAD side, since we usually do prototype builds before production. For library MSWord documents, they usually start at revision 0. Currently, we enter them in at Rev A and then revise the document to Rev 0. This leaves the rev A, which we really do not need or want. Is it possible to setup a different Revision scheme for documents than parts?