Community Tip - Need to share some code when posting a question or reply? Make sure to use the "Insert code sample" menu option. Learn more! X
"David Butz" wrote:
CM I don't think there is a way to force a double Regen with relations or anything like that. I think that the software is operating the way it was designed, even though it seems perverse in cases like this. I believe it dates back to a time before Evaluate Features existed. At that time you could create Reference Dimensions, then make other Features dependent upon those non-driving dimensions. There was a set order of Regeneration with Reference Dimensions evaluated last, after everything else. What they need is "SuperRegen" or something similar (really just a double Regen). David
"Jeroen Janssen" wrote:
What might work, but kinda depends on the relation, add the relation to "post regeneration" instead of "initial" (pull down menu at lower right bottom of relations screen)