cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Did you get an answer that solved your problem? Please mark it as an Accepted Solution so others with the same problem can find the answer easily. X

Pro/E / Pro/Intralink Connection Error

pstephens
10-Marble

Pro/E / Pro/Intralink Connection Error

Hello All,


I have a Pro/E / Pro/Intralink launch problem that I have not been able to find a solution for.


We currently use Pro/E WF2, M190 with Pro/Intralink 3.3, M021 for production.


We are planning moving to WF5 M060 and PDMLink 9.1 in a couple of months.


WF2 was working perfectly until a couple of months ago when I loaded WF5 and began testing it as well.


Now, every time I launch Pro/E WF2 from Intralink linked to a workspace (Intralink-Launch Pro/ENGINEER-Workspace-xxxx) on my machine I get the following error message:


"Pro/INTRALINK connection error -Pro/INTRALINK launch command not specified."


I select cancel and can work in Pro/E and it is linked to the workspace and I can work ok in Pro/E, but it is affecting my J-Link apps in that the session will no longer connect to an async J-Link app.


If I launch Pro/E on a colleague's workstation I do not get the error, but I cannot use that machine full time.


Initially I did not have a different cache directory specified for WF2 and WF5 in the startup batch file but now do.


A tech support call to PTCwas unable to find a solution.


Any advice would be greatfully received.


TIA


Paul Stephens


Kenworth Trucks Australia


0 REPLIES 0
Announcements


Top Tags