I would like to be able to take full advantage of the machine, pinch
turning, 5axis simultaneous, simultaneous work zones. Moving parts from one
spindle to the other, Bar feeder also probing. Machine uses one program for
upper head and another for lower so tying that together on the programming
side and post side I'm sure there are some challenges. Then there is the
question how long to have post built? How much tweaking should I expect
after it's built? Use a guy onsite or offsite to develop post?
Thanks
Dale