Community Tip - Need to share some code when posting a question or reply? Make sure to use the "Insert code sample" menu option. Learn more! X
All,
For the next upcoming rehearsal migration, we may need to have to the
Pro/I clone server at one site and the PDMLink server at another. The
sites are approximately 10 miles from each other and are connected via
a shared high bandwidth WAN connection but with lots of security "infrastructure"
between them. I have been asked if this is feasible.
Does anybody know what is the nature of the communication between the
Pro/I clone server and the PDMLink environment? Is it, in general, bulk
data transfer, or is it "chatty" and geared for LAN use only? If a mixture
of both, is it predominantly one or the other? In prior migrations, both
servers have been on the same LAN.
Any assistance would be appreciated.
Tom (thomas_hogan@verizon.net)
Migration of Metadata should not be a problem. Why don't you use the pre-copy option for the vault?
Start using another media to copy the Intralink files, when it will come to production migration just updgrade these with the delta and you should be ok