Community Tip - Need to share some code when posting a question or reply? Make sure to use the "Insert code sample" menu option. Learn more! X
Is it possible to change status of the drawing from 40 to 10 in PDM without changing revision?
Are those lifecycle levels for your company?
We use draft, design, prototype, released and obsolete.
The drawing status can be changed if you have the proper permissions. See your PDM administrator for help.