Community Tip - Did you know you can set a signature that will be added to all your posts? Set it here! X
Is it possible to change status of the drawing from 40 to 10 in PDM without changing revision?
Are those lifecycle levels for your company?
We use draft, design, prototype, released and obsolete.
The drawing status can be changed if you have the proper permissions. See your PDM administrator for help.
