Adding new item in BOM last raw

Abhinand
14-Alexandrite

Adding new item in BOM last raw

Hai all,

 

Please let me know how to place a newly added component to bottom of a existing BOM (as a last item in existing BOM). Right now the newly added components are added as position number-1 in BOM and the existing item which was in Position No- 1 is pushed to position number-2.

2 REPLIES 2
kdirth
21-Topaz I
(To:Abhinand)

1. Select Repeat Region from Table tab.
2. Select Fix Index.
3. Select BOM table
4. Select record to fix.
5. Enter the fixed number required.
6. Repeat 4 and 5 for additional fixes
7. Select Done.
8. To unfix, after selecting table, elect Unfix from menu, then select record to unfix.


There is always more to learn in Creo.
Abhinand
14-Alexandrite
(To:kdirth)

Dear Kdirth,

 

Sorry for the confusion. I was referring to EMX Bill of Materials which populating primarily when we are  executing from EMX Assembly tab. Please refer attached Picture for the BOM.