Ability to manage a "Trial BOM" in Windchill and send to ERP
Description:
Version: Windchill 12.1
Use Case:
Here is the high level requirement :
It must be possible to manage a trial BOM that supports the scenario to produce a limited number of end products with the same Part Number (SKU) as the Production BOM(EBOM and MBOM)
The same Trial BOM could be made as Main Stream Production BOM as per the business needs or left as a Trial production only
There could be more then one Trial BOMs that need to run in Parallel and they will be merged through formal process
The Production BOM(EBOM and MBOM) should not be impacted by Trial BOM
The Trial BOM(s) should be able to sent to SAP where there is a placeholder(s) for the Trial ERP BOM.
-------------------
I had thought about some approaches, but leaving the options to brainstorm instead of skewing the solution approach.
Description:
Version: Windchill 12.1
Description:
Same as above