I am using Windchill Aerospace & Defense Release 12.0 and Datecode with CPS 12.0.2.0
I was assigned as the Materials and Process Engineer responsible for a CR. When i tired to reassign the M&P Engineer to a team member, it assigned someone else instead. That person has shared that misassignments has occurred multiple times and we believe it may be a technical issue. I would like to reassign correct the Materials and Process Engineer.
Out of curiosity, has the person who you reassigned it to checked their calendar? Might they have their calendar set to reassign tasks to someone else?
Quick Links > My Settings > Calendar