cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Community Tip - Did you get called away in the middle of writing a post? Don't worry you can find your unfinished post later in the Drafts section of your profile page. X

Translate the entire conversation x

How to operate worker when sending data from project link to PDM

JK_10068752
1-Visitor

How to operate worker when sending data from project link to PDM

I am using Windchill ProjectLink Release 11.0 and Datecode with CPS M030-CPS16


Is there a way to make the worker work when sending a project link to PDM?
If not, is there a way to import the data from the content tab created from the existing project link into the PDM?

1 REPLY 1
Fadel
23-Emerald I
(To:JK_10068752)

would you take a look at https://www.ptc.com/en/support/article/CS192391

Fede
Announcements
Top Tags